Perseverance at high temperature | Bridge hanging maintenance worker: standing on the shoulder of the "Iron Giant" should be the person closest to the sun
Author:Ningbo Evening News Time:2022.07.21
Maintenance equipment at more than 40 meters high altitude
The heat waves are rolling, and equipment inspections and repair are carried out in the narrow stuffy trailer cabin?
"Two hosts, 2 auxiliary machines plus other size equipment to transport heat dissipation together. The cabin is like the" sea sauna house ". Standing in one position for a long time, the soles will be baked by steel plates." Shao Zhanhai, the head of the wheel, said sweatically.
Shao Zhanhai and the "comrades" are responsible for ensuring the safe operation of the drag wheel. In the hot summer, in the roar of the engine and the vibration of the equipment, watching, nasal smells, ear listening, hand -touch ... they focused on the equipment maintenance. After a round of maintenance, in addition to the dark and sticky oil stains on the work clothes, the entire portrait has just been picked up from the water, and a clear sweat will be left every time you walk.
Coincidentally, at the second container company of Beilun, the North Lun, Ningbo, Xia Xia and the team members wearing thick orange workmanship with the team members, climbing up to 40 meters high bridge hanging on the scorching sun, and maintenance of the equipment. If the failure is found, the open -air "steam" is a few hours.
Bridge crane is the core equipment of the port. Whether the bridge crane can operate safely and orderly, directly affects the production efficiency of the entire port. Under the hot sun, the precision equipment of the bridge crane is hot and hot, and the failure rate also increases accordingly. Summer said with a smile that they were on the shoulders of the "Iron Giant" and "closest to the sun".
The main control cabinet, the flow device cabinet, the contact cabinet ... the power unit rotates in order, the steps are cumbersome and must not be wrong. The "reinforced iron bone" bridge crane has been scalded and can be fried. The maintenance masters stayed at more than 40 meters at a high altitude for more than half a day. Except for the helmet on the head, there was no other cover for the entire maintenance operation. The orange workers were dry and wet, and they repeatedly glowed white salt.
Shao Zhanhai and summer are just one of the epitome of the people who adhere to their jobs and high temperatures to win high temperatures. Under high temperature, the front -line workers of the Zhejiang Harbor Group and Ningbo Zhoushan Port Group adhere to their respective jobs, fighting epidemic, stabilizing production, and keeping unobstructed.
Reporter Zhou Hui Correspondent Hong Yuxiangwen/Photo
- END -
More than 25,000 criminal suspects have achieved remarkable results
On the morning of July 12, the Zhejiang Provincial Public Security Department held a press conference on the net net 2022 special action to report the overall work of the special operation and relea
On the eve of July 1st, the leaders of the four sets of teams in Baoshan District visited the old party members and difficult party members
This year marks the 101st anniversary of the founding of the Communist Party of Ch...