Shijiazhuang South Second Ring Road West Second Ring Road is completed and opened to traffic!The latest strategy goes up
Author:Shijiazhuang News Network Time:2022.07.21
After several months of hard work, the main roads of the provincial capital Shijiazhuang and the West Second Ring Road are completed and opened to traffic. Where is the main road of the new traffic? Where is export? The latest strategy will be presented one by one, and go!
1. Jiefang Street from north to south cannot turn right to the South Second Ring Road Bridge for the time being
Second, the main route of the South Second Ring Road from the east to the west of Hongqi Street and Vamin Street, the vehicles can leave the main road normally.
Third, the main route of the South Second Ring Road from the east to the west of Shitong Road is under construction. There are enclosures, and the vehicles cannot leave the main road through this.
Fourth, the main route of the South Second Ring Road from the east to the west, the vehicle can normally transfer to the ramp of Yuquan Road and Jingyu.
5. The exit of the Western Second Ring Road from the south to north to the north is already available with a water horse.
Sixth, the main route of the West Second Ring Road from the south to the north of Huai'an Road, the exit of Huai'an Road has been blocked with water horses, and the vehicles cannot leave the main road through this.
7. The main route of the West Second Ring Road is exit from the south to the north to the north. The vehicles can leave the main road through this.
8. The main road of the West Second Ring Road is from the north to the south of Huai'an Road. The vehicles can enter the main road and drive forward. The exit of Yuxin Road has been closed by cone barrels and water horses. The vehicles cannot leave the main road through this.
Nine, the southwest two rings are interconnected, and the vehicle can be transferred from the main road to Yuquan Road and Jingyu.
Ten, the South Second Ring Road from the west to east. Although the direction of the stone and copper road cannot be driven on the sign, the connection bridge between the South Second Ring Road and the South Third Ring Road in the provincial capital has been completed and opened to traffic. Leave the main road of the South Second Ring Road.
The eleventh and the South Second Ring Road came from the west to east of Hongqi Street. There were water horses closed, and vehicles could not leave the main road.
The twelfth and the South Second Ring Road exit from the west to east of China, and the vehicles can leave the main road through this exit.
Reminder: At present, some of the auxiliary road sections of the South Second Ring and West Second Ring Road, which are just completed in the provincial capital, are under construction. The staff said that according to the plan, the construction is expected to end in September this year.
- END -
[Display the image of the national civilized city] The cousin of the Yibin Civilized Transportation Works Contest |
Payment time: April 2022 -November 2022Organizer: The Transportation Police Division of the Public Security Bureau of Yibin City, Yibin City, Yibin CitySubmitting mailbox: [email protected] num
The Meteorological Observatory of Zhanyi District issued a heavy rain blue warning [Class IV/General
At 3:05 on June 10, 2022, the Meteorological Observatory of Zhanyi District issued a heavy rain blue warning signal: There was a strong precipitation weather in our district, and the precipitation (mi