Wuhan traffic will change greatly!
Author:Hubei Daily Time:2022.07.19
July 19th
Wuhan Municipal People's Government Portal website release
"Pilot Implementation Plan for the Construction of Wuhan Powerful Power"
(Plan for short)
Clarify the construction
Inland open -type comprehensive transportation channel,
Promote the integration of the whole region and the priority development of the bus,
Construct a multi -party collaborative emergency logistics grading system,
Promoting vehicle road collaborative innovation applications
Four pilot tasks
Provide experience for the construction of a power of transportation
Wuhan traffic will change greatly
According to this plan, in the next 1 to 2 years, Wuhan will fully promote the pilot projects of the inland open comprehensive transportation channel.
The third runway and supporting engineering of Wuhan Tianhe Airport
Plan the construction of the fourth runway
The "Plan" pointed out that continuing to strengthen the connection of international domestic routes at the airport and build a "35+15+30" (35 business routes, 15 freight routes, 30 articles travel routes).
Promote the expansion and upgrade of Wuhan Tianhe Airport. The third runway and supporting project of Wuhan Tianhe Airport are newly built, and the construction of the fourth runway is planned.
Improve the functional layout of the freight area and promote the comprehensive improvement of the aviation logistics park and the construction of the bonded logistics center (type B) project. Strengthen the construction of supporting facilities, and implement the construction of the Wuhan regional high -altitude control center and postal express processing center.
Accelerate the expansion project of the third phase of Yangxia International Port
Further enhanced Jianghai Lianlian Energy level
Wuhan will accelerate the preliminary work of the third phase of the Yangluo International Port, and start the 5th and 6th berths of the third phase of the Yangli International Port No. 3 in the timely start. Accelerate the integration of Yangluo International Port and Port, and improve the ability to load and unload the loading and unloading of foreign trade containers.
Wuhan will build a water transportation system for "rivers and sea direct, water transfer, iron and water connection, along the river, and port city". Relying on the Golden Waterway of the Yangtze River, it will further enhance the energy level of the river and sea.
Construction of Wuhan Metropolis Ring Ring and Right Expressway
Realize the direct link of travel
The "Plan" clearly states that Wuhan will accelerate the ability to cross -border access and distribution services in the Central European trains (Yangtze River), continue to strengthen the construction of west and north -direction channels, and explore the development of the south direction channel.
And speed up the development of high -speed rail networks. Construction of the Shanghai -Chongqing high -speed railway Wuhan to Yichang section, Wuhan to Hefei section and Wuhan hub direct line. Promote the convenient channels of high -speed rail from Wuhan to Hangzhou, Guiyang and other directions.
Strengthen the extension and docking of urban railways such as Changzhutan, Poyang Lake, and Central Plains in the urban railway of the Wuhan Metropolis Circle. Two colors (two verticals (Beijing -Guangzhou, Beijing -Kowloon Western Channel) (Shanghai -Chongqing, Shanghai Han Rong) two -diagonal (Fu Yin, Jiao Gui) "" Super Rice Font "high -speed rail network is gradually formed in Wuhan.
At the same time, the Wuhan Metropolis Circle Travel Directly connects directly. Construction of Wuhan Metropolitan Ring Ring and Right Expressway, promote the large channel of Wuhan Metropolitan Circles, Wuhan Ring Expressway Zhongzhou to Beihu Section Reform and expansion projects, build Wuhan to Dawu Expressway Wuhan to Hekou section, Wuhan to Yangxin Expressway Wuhan to Ezhou Duan, Wuhan Koukou to Xiaogan Expressway second phase project. The new Wuhan to Tianmen, Wuhan to Songzi Highway, the implementation of the Beijing -Hong Kong -Macao high -speed Wuhan section, the Shanghai -Chongqing highway Wuhan to Huangshi section reconstruction and expansion project, planning the formation of Wuhan as the center and radiating the "Seven Ring Thirty Shooting" high in Wuhan Metropolis District Expressway network, realize direct connection and direct access.
The development of Wuhan Tianhe Airport and Ezhou Huahu Airport
Realize fast two -way Unicom
Form 4 major hubs with international competitiveness. Focusing on Wuhan Tianhe Airport, Ezhou Huahu Airport, Wujiashan Railway Base, and Yangluo International Port, it has created four hubs with international competitiveness. Strengthen the linked development of Wuhan Tianhe Airport and Ezhou Huahu Airport, promote the construction of channels such as highways, freight lanes between the two airports, and realize the rapid two -way Unicom of the two airports.
Improve 13 important hubs with national influence. New high -speed rail Hanyang Station, Wuhan Tianhe Station, Yangtze River New District Station, etc., formed the "Five Masters, Hankou Station, Hankou Station, Hanyang Station, Wuhan Tianhe Station, Wuchang Station). Further improve the first -level logistics node of the Wujiashan Container Center Station and the second -level logistics nodes of Daochang, Dahuoling, and reserved the construction conditions of the freight stations such as Yangxia, Optical Valley, and Changfu to form a "1+2+3" third -level Logistics node network.
Vigorously develop the Economic, Air Economy, and Railway Economy of Lingang, implement the construction of high -speed rail hubs such as Hanyang Station and the Yangtze River New District Station of the Shanghai -Chongqing high -speed railway, and accelerate the comprehensive development of the station area and the "integrated station city". In terms of promoting the integration of the whole region and the priority development of the bus, the plan proposes:
Develop customized bus,
Intercity bus, water bus, air rail
Create a multi -transportation network based on conventional buses, rail transit, customized bus supplements, water buses, and slow transportation.
Explore the night travel bus and microcirculation bus that operates autonomous driving in a specific area.
Focusing on the connection of supporting rail transit siting, it will increase the density of the new city network network.
Actively promote the study of bus fares, and promote the transit policy of bus to the new city.
Promote the "one card brush" of the nine cities of the Wuhan Metropolis Circle.
Prepare the subway city planning of Wuhan Metropolitan Circle to promote the implementation of a group of subway Demonstration projects that are integrated and fusion of production and cities.
Improve the bus fare system
And preferential policy
Establish and improve the management and adjustment mechanism of bus fares, and promote the implementation of the "full way, the city's domain" public transport transfer preferential policies.
By 2025, scientifically optimize the existing bus lanes, and on this basis, a batch of bus special channels are designed to strive to reach 300 kilometers unidirectional mileage. Improve the efficiency of the use of bus lanes, reduce the interference of general vehicles for bus lanes, and promote the use of "bus lanes + co -integrated lanes".
Increase the construction of bus stations. The central urban area focuses on promoting the construction of Maotan Village Bus Counterfeit, Gaoxin Second Road BRT Betting Field, Baisha 5th Road Bus Hub Station, and the first and last bus stations of Sixin South Road. The total scale is 317,000 square meters. Each sub -city has 2-4 bus stops, and the new city realizes "one city, one field" or "one city multiple" to meet the parking and maintenance needs of public car and trains. Increase investment in the construction of bus stations. By 2026, the construction has completed 22 bus stations, and 1,829 new bus parking spaces and charging piles are added to provide basic guarantees for the fulfillment of new energy of the bus. Establish and improve the support policies for the construction of a special funds for the construction of the bus site, and arrange financial funds to ensure each year.
Increase the promotion of new energy buses, and by 2025, 100%of the new energy and clean energy vehicles will be fully realized (except for emergency guarantee vehicles, long -distance high -speed buses, and some rural buses).
At the same time, the "Plan" also clarifies the improvement of urban and rural public transportation development mechanisms, strengthening the institutionalization of public transport regulations, and improving the policy of buses.
Reading full text:
Notice of the General Office of Wuhan Municipal People's Government on Printing and Distributing the Pilot Implementation Plan for the Construction Pilot Construction of Wuhan City && &&
Source: Hubei Daily All -Media Reporter Li Yuan, Da Wuhan Client
- END -
[First -line fax] Drive two thousand kilometers to drink "receiving wind wine" and hit the muzzle of "Chang'an Action" in Anhui Public Security
Men drive 2,000 kilometers to workAfter eating a receiving wind wineThe drunk driv...
The on -site promotion meeting of Xiexian County forbidden drug shovel poisoning was held
In order to conduct in -depth investigation of prohibited poisoning and strive to ...