Chengdu today adds local "2+2" at 0-14 o'clock

Author:Sichuan Observation Time:2022.07.19

At 0-14 on July 19, there were 2 new local diagnosis cases in Chengdu, and 2 cases of natives were not infected. As of 14:00 on the 19th, there were 22 local confirmed cases and 16 symptoms of infected infections from the epidemic.

2 cases of new local confirmed cases

Two cases of new native symptoms of infection

Case 35: Living in the North District of Jinhongjunyuan, Wuhou District, the close contact with case 6 is diagnosed as a symptom infected with local natives.

Case 36: Living in the first phase of Runyang · Guanlan Lugao, Xindu District, the close contact of the case 12 is diagnosed as a local confirmed case.

Case 37: Living on No. 2 attached to No. 16 twelve bridge roads in Qingyang District, the close contact with the case 18 is diagnosed as a local confirmed case.

Case 38: Living in Qingshui Green Garden Community, Qingyang District, the close contact with the case 18 is diagnosed with asymptomatic infections in the local area.

There are currently 24 high -risk zones in Chengdu, which are respectively

Jinjiang District (5): Building 14-15 in Jindong Garden, 1 Building of Nanfu Jin, No. 48, No. 48 Nanyu City Street (including the bottom floor of the building), Kunlun Huaying, Longhu Jinglan Peninsula District 1- 1- 1- Two buildings (including the bottom floor of the building)

Wuhou District (6): 1-2 Building of Baihua Apartment, 2 Zhonghai Greenwich City (including the underlying merchant of the building, Ximei Meimei Medical Beauty), 1, No. 28, South 4th Section 1, No. 1, Jiangtian Road 1 Building 1-2, No. 1, No. 70, Yulin North Street, Yulin Street, Building 4-5, Building 4-5, North District, Jinhong Junyuan

Chenghua District (2): Two Kim Ke Tianshi City (including the bottom floor of the building), 5-8 Begonia Famous Houses (including the bottom floor of the building)

Qingyang District (3): 5, Yixin Garden, No. 2 No. 2, No. 16, No. 16, 12th Bridge Road, and 3 of Qingshui Green Garden

High -tech Zone (1): 6, Nanyuan District B, Building 6

Longquanyi District (3): 7 buildings in the second phase of Yidu City (including the bottom floor of the building), 11-12 districts of Taohuayuan Villa 27, and 40-41, Weiban City (including the bottom merchant)

Golden Bull District (1): The first opening of Longhu Zizhen Community (Phase 1) Building 3

Tianfu New District (1): 1 Building 1 of Lake Ecological City Lanyu Creek Bank

New Metropolis District (2): Holy Cai · Bo Shang 17-18 buildings, Runyang · Guanlan Ludao Phase 7 Building (including the bottom floor)

There are 25 central risk zones, namely

Jinjiang District (5): 1-13 Jinsong Garden (including the bottom floor of the building), 2 Nanfu Jin, 1 and 4, No. 48, No. 48 Nanyu City (including the bottom floor of the building), the Rhine Spring Community (Including the bottom floor of the building), 3 area A, Longhu Jinglan Peninsula (including the bottom floor of the building)

Chenghua District (4): Jinke Tianshi City 1, 4, 6-11 (including the bottom floor of the building), No. 1, Shuanglin Nanzi Road, 1-4 Begonia Famous House, 9-13 Building 9-13 And the external parking lot (including the bottom floor of the building), No. 9 Huayou Lane 9

Wuhou District (4): No. 15, Section 4, Renmin South Road, No. 3-7, Greenwich City, Zhonghai, No. 2-6, No. 28, No. 28, No. 28, No. 1, and 1-3 Tianfu, North District of Jinhong Junyuan New District (1): Lake Ecological City Lanyu Creek Bank 2-3, 5-9

Qingyang District (3): Yixin Garden 1-4, 6-9, No. 1 No. 1, No. 1, No. 1, No. 14, No. 14, No. 14, No. 1, No. 1, No. 1, and No. 1, Building 1 and 2

High -tech Zone (1): Nanyuan District B is removed from 6 other buildings outside the building

Longquanyi District (2): The first and second phases of Yidu City (including the bottom floor of the building, except 7 and the corresponding dealers), Taohuayuan Villa 27 and 28 districts 28 areas 8-11

Jinniu District (1): First opened Longhu Zizhen Community (Phase 1), 1-2 (including the bottom floor of the building), New Capital District (2): Shengcai · Booshang Community except 17-18 buildings (Including the bottom floor of the building), Runyang · Guanlan Ludao Phase I Phase I except 7 other buildings (including the bottom floor)

Wenjiang District (1): 9-49, Blu-ray Xiangrui Lake, Yongquan Street

Chongzhou City (1): Tianxiang Community, Town Town

Jinjiang District, Wuhou District, Tianfu New District, Chenghua District, Qingyang District, High -tech Zone, Longquan District, Jinniu District, Xindu District, Wenjiang District, Chongzhou City, except high, and mid -risk areas are low -risk areas.

In order to facilitate the public to investigate the risk trajectory, the trajectory of the local epidemic cases of Chengdu this round of local epidemic cases is now sorted out as follows. If there is a overlapping trajectory with the following activities, immediately report to the community and units (or hotels in the residence), and receive two nucleic acid detection (interval 24 hours) within three days. If you have any questions, please call 12345 for consultation.

*Note: For more than 10 days before the activity time of cases, the venue where the investigation and cleaning and disinfection have been completed are no longer included in the scope of the investigation. The above -mentioned red part is the new activity trajectory.

- END -

Beijing's latest notice!Beijing today adds two new cases of the soil without symptoms of unparalleled soil. On June 23, the latest news from Beijing epidemic situation today

Beijing today adds 2 new cases of soil without symptomsOn June 23, a press conference on the press conference of the 374th crown pneumonia epidemic in Beijing was held.Beijing Youth Daily reporter lea

[Police Pioneer] "Iron Old Man" set up a military order: without breaking the case, take off the police uniform!

Zhuanglang land is known as the terraced kingdom. Here the mountains and mountains...