Line 10 can be improved again!Minimum baking interval of 3 minutes and 18 seconds
Author:Shenzhen Evening News Time:2022.07.19
The deep night reporter learned from the Shenzhen Metro Group that since July 18, 2022 (Monday), the Shenzhen Metro Line 10 will use the new version of the working day to run the train. After the optimization adjustment, the minimum section of the early peak of Line 10 is 3 minutes and 18 seconds, the flat peak period is 6 minutes, and the minimum bus interval at night peaks is 3 minutes and 52 seconds. Citizen travel will be more convenient and faster.
It is reported that the Shenzhen Metro Line 10 was opened on August 18, 2020. It is 29.3 kilometers in length and is one of the backbone lines in the north and south. In July 2022 (as of July 15), the average number of passengers during working days reached 383,500.
The reporter learned that in order to meet the growing demand of citizens, starting from July 18, Shenzhen Metro Line 10 will compress the interval and improve capacity and transportation capacity by opening the launch train. After the running map is adjusted, the largest number of trains on the morning peak during the early week of working days increased to 30 columns, of which from 7:30 to 9:00 periods. 3 minutes 18 seconds, the transportation energy increased by 19%. The direction of the Futian Port to Shuangpu Street was compressed from an average of 5 minutes and 17 seconds to 4 minutes and 30 seconds, and the transportation energy increased by 17%.
Both parties from Futian Port to Shuangpu Street during the Pingfeng period compressed from 6 minutes and 16 seconds to 6 minutes, and the transportation energy increased by 4.4%. During the evening peak, the two parties from Futian Port to the Xuexue section were compressed from 4 minutes and 07 seconds to 3 minutes and 52 seconds. 7 minutes and 44 seconds, the transportation energy increased by 6.5%.
"This adjustment combines the actual passenger flow characteristics of the 10th day of the 10th, and optimize the train driving organization plan for the optimization of the train. It is expected to further alleviate the crowded passenger flow in the direction of Longhua District in the morning peak and enhance the experience of passenger travel." Shenzhen Metro -related The person in charge introduced.
Shenzhen Metro Group reminds that after the implementation of the "new map" of Line 10, please pay attention to the station announcement and the relevant operation adjustment information of the Shenzhen Metro's official app, Weibo, and WeChat platforms to reasonably arrange travel. In case of passenger flow and epidemic prevention control, please cooperate with and wait patiently. For help, you can go to the station customer service center or contact the station staff.
Shenzhen Evening News reporter Dong Yuhan correspondent Wang Yocheng
- END -
Nanhu New District: Effectively build a safe production defense line in the field of civil affairs
In order to further improve the level of production safety in the civil affairs fi...
Yiyuan County was successfully held in 2022 Gume tree fruit rights auction
Kunming Information Port News Correspondent Zhao Jufang Zhao Xiping, on June 30, Yiyuan County successfully held 2022 Gumei tree fruit rights auction. The purpose of this move is to accelerate the con