Hohhot to Ordos will build a new highway
Author:Hohhot Evening News Time:2022.07.18
Recently, the S27 Hohhot to Ordos highway construction project has been approved by the autonomous region government in the BOT model.
S27 Hohhot to Ordos highway construction project is about 204.4 kilometers in length, of which the Hohhot section is about 77.9 kilometers long, and the Ordos section is about 126.5 kilometers long. It is constructed in accordance with the two -way four -lane highway standard, with a total investment of about 14.52 billion yuan.The starting point of the main item is located at Hohhot's S59 Hubei High -speed Shengle Interchange. The ending point is located at 2.1km on the north side of the Bao Mao high -speed grid top cover. The design speed reaches 120 km/h.
It is understood that the S27 Hohhot to Ordos section highway will actively promote photovoltaic power generation, large -scale development of wind power, and step -by -step photocacy charging stations. Based on ecological protection, it will strengthen the effective support of low -carbon development in transportation infrastructure.After the project is completed, it will shorten the distance between Hoheh and Hohht to Ordos of about 60 kilometers, saving 1 hour.
Source: Inner Mongolia Daily
Coordination/Liang Jingyuan School Reading/Liang Jingyuan Preliminary Audit/Zhang Yao Zhang Yao Final Trial/Zhao Min
not
not
- END -
Prosecutor's "heart" Pu law "cools" public opinion
The people have called, and the inspection responds. According to the arrangement ...
Xingning Meteorological Observatory issued heavy rain yellow early warning [III class/heavier]
At 13:16 on June 10th, Xingning Meteorological Observatory issued Xingning Yellow Early Warning signals. Please pay attention to defense.