From now until September 30, the National Highway 318 before 10:00 every day, Kangding to the Putuado Mountain Pass section can be connected normally
Author:Kangba Media Time:2022.07.18
A few days ago, the Ganzi Prefecture Transportation Bureau and the Ganzi Prefecture Public Security Bureau issued a supplementary notice on the traffic control of the Kangding to Two Mountain Pass Section of the National Highway 318. At present, Ganzi Prefecture has entered the peak tourist season, and personnel vehicles have increased sharply. In order to further alleviate the pressure of road congestion, to achieve construction and traffic, it is decided to have the traffic control of the National Highway 318 Line 318. Adjust in September. The relevant matters are notified as follows:
1. Control section
National Highway 318, Kangding City (K2856+850) to Zhenda Mountain Magic (K2887+100), with a construction mileage of 30.453km.
2. Control time
The construction period of the road base and bridge culvert project: July 11, 2022 to September 30, 2022; October 1st to October 7th, 2022, according to the National Day "Golden Week" control notice; from October 8, 2022 , Perform according to the original announcement.
3. Control method
July 11, 2022 to September 30, 2022: Diversion of blue brand vehicles (including small cars, new energy small cars, etc.) through S434 Ta North Road every day from S434 Line Kangding to the Putuado Mountain Pass section can be connected normally.
The specific route is:
(1) Chengdu -G318 Kangding City's transit part of the Guoda Mountain Tunnel -S434 Ta North Road -Taogong Town -Ba Mei Town -Sichuan -Tibet North Line G317 entry Tibet;
(2) Chengdu -G318 Kangding City's transit part of the Guoda Mountain Tunnel -S434 Tower North Road -Kangding Airport Road intersection -Kangding Xintuqiao Town -Sichuan -Tibet South Line G318 entry Tibet;
"One -way tail vehicle system" release traffic control is performed on yellow -card vehicles (including large trucks, travel buses, passenger cars with regulated routes, etc.). Every day from 10:00 to 19:00, the traffic control time of "one -way tail car", the rest of the time is the vehicle traffic time.
Fourth, control point settings
The remote setting of traffic control is located at the intersection of the G318 Kangding City's transit section. The stop point is located at the intersection of the Kangding Duoduoshan Airport. The middle section is set up at 200 meters in the direction of the G318 Kangding City Automotive Management Office. During the construction area of the road -based and bridge culverts during the construction area of the proximal construction area, it was effectively controlled according to the construction site and effectively used the emergency parking lot along the line.
Source: Chuanguan News
Xue Editor: Xu Zhiheng
Editor -in -chief: White Horse
Review: Yang Jie
- END -
pay tribute!Fengrun grand commendation!
Military and civilian fishDouble hugs all over the groundDedicated with a ray of l...
Zheli Office, World Internet Conference ... The top ten iconic achievements of Zhejiang's digital economy innovation and development are released today
On July 13th, at the Zhejiang Digital Economy High -quality Development Conference...