Shenzhen releases several measures to support green and low -carbon development in the construction field
Author:Shenzhen Special Economic Zone Time:2022.06.25
Shenzhen recently released the "Several Measures on Supporting Green Low Carbon Development in the Field of Building" (referred to as "Several Measures"), which will accelerate the application of building information model (BIM) technology and vigorously promote the quality of prefabricated construction projects. For prefabricated construction projects that meet the relevant requirements and have been evaluated as a demonstration significance, the maximum funding of the building area is 100 yuan per square meter, and the amount of funding for a single project is 8 million yuan.
"Several measures" were drafted by the Municipal Housing Construction Bureau in conjunction with the Finance Bureau. According to the "Several Measures", Shenzhen will improve the quality of building construction at high standards. Accelerate the application of building information model (BIM) technology. Guide project construction projects widely use BIM technology, improve the intelligent management level of project information, and improve the quality of construction engineering. For the relevant standards and requirements of the national, Guangdong, and Shenzhen BIM, if the municipal construction authority is rated as the BIM technology application demonstration project, the maximum funding of the building area is 15 yuan per square meter, and the upper limit of the amount of funding for a single project is 1.5 million yuan. And does not exceed 3%of the cost of the project construction project. The same project is only funded once.
The "Several Measures" proposes to vigorously promote the improvement of prefabricated construction projects, guide and cultivate enterprises to strengthen integrated application and technological innovation, and continuously improve the level of construction industrialization. For the relevant standards and requirements of prefabricated buildings in the state, Guangdong and Shenzhen, and being evaluated by the competent construction department of the state, provincial or municipal construction as a demonstration significance project, the maximum funding of 100 yuan per square meter in accordance with the construction area, and the amount of funding for a single project The upper limit is 8 million yuan, and it does not exceed 3%of the project construction project cost. The same project is only funded once.
The "Several Measures" proposes to strengthen the green regeneration of building waste, promote the optimization and upgrading of the comprehensive utilization of construction waste, and cultivate a group of comprehensive utilization enterprises with demonstration and leading effects to create a group of comprehensive use of construction waste products. Demonstration Project. Guide property service enterprises to implement technological transformation, strengthen scientific management, reduce operating energy consumption, improve the quality and service level of property management, and create a safe, civilized and harmonious work and living environment.
(Author: Shenzhen SAR Reporter Dou Yanwen)
- END -
[Dry and answer]@【【【【【【【→ →
recentlyYunnan Province is issuedYunnan Provincial People's Government on the impl...
Important adjustment of Wuhan Provident Fund
Housing Provident Fund withdrawal and loan business The amount of increased provident fund rental withdrawal On June 9th, the reporter from the Yangtze River Daily learned from the Wuhan Housing