Wuhan Qingshan is still capped in the largest construction of a house under construction. It will benefit more than 3,000 residents
Author:Pole news Time:2022.09.01
Polar news reporter Li Xiancai
Video editing Ye Yan
Correspondent Wang Hangneng
Intern Chen Zuchen
At 2 am on August 31st, the last concrete was successfully poured in Building No. 2, Building 2, Wudong Village, Wuhan, Wuhan, Wuhan, Wuhan City, Wuhan, Wuhan, and China. This indicates that the 15 residential buildings in the project achieve a comprehensive capacity of the top, and it will be fully decorated.
The project is located on Wudong East Road, Wudong Village, Qingshan District, with a total construction area of about 433,800 square meters. After completion, it will benefit more than 3,000 residents, which will greatly improve the overall living environment of residents in Qingshan Wudong area.
Qingshan Wudong Village also built land construction projects to build projects
Jiang Yang, the person in charge of the construction of the Fang Wuhan Changjiang Ecological Joint Development Co., Ltd., said that in addition to 15 high -rise housing and two -story shops along the street, a neighborhood center was planned as a whole, a 15th kindergarten and 3rd puppets to provide residents with the elderly to the elderly The convenience of leisure and children.
According to reports, as a key people's livelihood project in Qingshan District, since the construction of the project in November 2020, it has overcome various external difficulties such as epidemic, flood season and high temperature, and internal difficulties such as large earthquake excavation and large engineering volume. Comprehensive preparations and coordination The people, machines, and material resources at the scene started at the same time.
Hu Jing, the manager of China First Metallurgical Project, said that during the peak construction period, the number of operators attended a single day of service as high as 1,300. At the beginning of the project, it was established to be driven by the brand, creating a demonstration site in accordance with high standards, and establishing a good market effect.
To build a demonstration site, civilized construction is the top priority. The project is adjacent to the Navigation rudder community. In order to reduce the impact of the lives of surrounding residents, the project department has strictly controlled the construction site environment through measures such as dust reduction and noise reduction, and has been recognized and supported by surrounding residents.
In order to improve the efficiency of operation and ensure the quality of the project, the three ultra -high -rise buildings of the project use the aluminum mold climbing technology, which greatly solves the defects such as repeated disassembly and running molds of traditional templates, and achieved the purpose of shortening construction periods, improving quality and efficiency, while aluminum molds at the same time The climbing frame belongs to a new type of scaffolding system, which can be lifted and surrendered by itself, which is more secure than traditional protection and energy saving and environmental protection. "The climbing process does achieve the purpose of improving quality and efficiency. Compared with traditional scaffolding, construction efficiency is higher." Said Jia Jiaqi, the person in charge of China Yishou Technology.
In addition, during the construction process, the project promoted development with humanistic care. By carrying out the methods of staffing and sports activities, birthday meetings, migrant workers' epidemic prevention knowledge lectures, laws and health lectures, etc., participating in the construction of the construction staff greatly improved production efficiency.
(The picture is provided by the correspondent)
- END -
"Rest interest rates" again!Buyers have repaid their loans in advance!Is it cost -effective?Expert reminder →
In the past two years, the interest rate of mortgages in various cities has been s...
Real Estate Morning Post | Dade Liangxing: In the first half of the year, the 74 large transaction turnover of the real estate market in China was 75 billion yuan
Today is August 11, 2022, Thursday, Chengdu, cloudy, 25-37 ° C, today's limited number 4 and 9. Good morning everyone, come to today's real estate morning newspaper.Real estate industry information1....