The Canal New Town steps into high -quality development track
Author:Jining Daily Time:2022.08.30
The construction of Jining (correspondent Yuan Jin Liu Zhao) Construction of Canal New City is a major decision -making arrangement made by the Jining Municipal Party Committee and Municipal Government. It is an important part of Jining's "urban integrated integration and development". opportunity. The Canal New Town District is superior and its transportation is well -developed.
In recent years, the Canal New City has always adhered to the "first -class, first, and the only one", firmly grasped the main line of project construction, production safety, and epidemic prevention and control, highlighting the construction of infrastructure construction, urban management and operation, etc. Decisive and starting is the motivation style of sprinting. "Seeing opportunities, taking advantage of the situation, and overcome difficulties. A modern city, city of culture, entrepreneurship, and future cities are accelerating the rise.
Do a real top -level design to grasp the correct orientation. Ren urban area adheres to the construction of the canal new city as the "No. 1 project". By building a hard carrier, the soft environment has been established, and the soft environment has achieved the comprehensive and rapid construction of the new city. The Canal New Town combines the construction of the canal culture belt, focusing on building a cultural and creative demonstration area, an information industry driving area, and a new industrial agglomeration area, stimulating the strong span of the central urban area, and comprehensively opening the Jining Grand Canal era. Focusing on the industrial development direction of "East Coast Cultural and Creative, West Coast Science and Technology Innovation, Ecological Livability, and Production City", the industrial development plan of the Canal New City has been prepared, and the four major industries: smart information, business logistics, medical care, health, and cultural tourism The main industrial structure has formed the integrated development trend of industrial development and new city construction.
Crack the bottleneck and save the driving force. In order to effectively resolve the bottleneck of the construction of the Canal New City, the core area of the Canal New Town implements integrated comprehensive development model, covering investment and financing, construction, management, and industrial introduction. Fourth Highway Engineering Bureau Co., Ltd. and CCCC Fourth Airlines Engineering Survey and Design Institute Co., Ltd. won the bid. And operation. The construction of a comprehensive development project and a balanced area of the core area of the Canal New Town is about 12.88 square kilometers, from the east to the West Road of Canal, the west to Jishui Avenue, the south to Jining Avenue, and the West Road in the north. Yuan, covering 49 sub -projects: infrastructure construction, relocation resettlement, and public service facilities.
Optimize the construction technology and fight at all speed. The high -pressure pipe corridor Beijing -Hangzhou Grand Canal pipeline work well is 54 meters deep underground, with a total of 105 pieces, a total of 4829 meters. It is the most construction of walls and top pipe wells across the Beijing -Hangzhou Grand Canal. The project participating in the construction of all parties performed their duties, each responsibility, and multiple measures to strengthen the control of safety and quality, adhere to the prevention and control of the epidemic, fight for the project, fight day and night, excess to complete the prefabricated installation of the pipe gallery, the old Canal operating well, earthwork Multiple node targets such as excavation and ground wall construction.
West Wuli Camp A Land A residence project is the key relocation and resettlement project of the core area of the Canal New City. The total area is 115,000 square meters. It contains 26 high -rise housing and related education and business facilities. After completion Construction space. During the construction process, the innovation of the A plot A of the West Wuli Camp adopted the "aluminum model" process, which greatly improved the quality of the project, effectively shortened the construction cycle, reduced the comprehensive construction price of the project, and laid a solid foundation for the efforts to build the Mei'anju project.
In the next step, the Canal New Town will seize the construction and development opportunities of the National Cultural Park of the Grand Canal, and in -depth excavation of the long -established Sui, Tang Canal Ancient Road and the cultural advantages of the Ming and Qing Dynasties. Actively undertake the urban space in the main urban area, drive the urban function of the west of the urban area, and follow the development goals of "three years, five years, and ten years" and the "integrated two wings, three districts, four zones" planning vision. , Together, accelerate the construction of a new city with temperature, culture, and dynamic canal, and build a new city of canals, cities, realm, and karma.
- END -
Guangzhou Housing Provident Fund Rental Extraction Limits increase to 900 yuan per person per month
In order to implement the decision -making and deployment of the Party Central Committee and the State Council on the prevention and control of the epidemic and economic and social development, furthe
Implement 6 high -speed rail and 5 urban, T3 terminal and comprehensive transportation center planning adjustment
Recently, Guangzhou Baiyun International Airport Terminal T3 and Comprehensive Tra...