A heartwarming story behind Hubei University of Science and Technology notifications poured sweat on the shore of Lake Lake
Author:Future Online Universities Time:2022.07.07
"This is a warming movement that is really concerned about the people's affection." Recently, a notification issued by the "Sanmin" practical activity of Hubei University of Science and Technology to solve the worries of the college, which caused the teachers and students to be teachers and students. Heated discussions, harvesting full screen praise.
It turned out that when Chen Shengan, the dean of the Digital College, was worried that the leakage of the teaching building affected the professional certification of the teacher, a "Notice on Collection of the School of Summer Infrastructure in 2022" was issued to him. According to the content of the notice, Chen Shengan quickly applied for an infrastructure project list. "Waiting for the construction of the infrastructure office now," he said happily.
When I walked into the infrastructure, it was found that behind the notice of warm heart was an infrastructure person who poured sweat on the shore of Lake Lake.
Project development brush out "new height"
Recently, a series of activities such as musicals, graduation ceremonies, and theme group classes are staged wonderfully in the engineering experimental training center building.
"Now preparing for fire fighting testing, it is expected to be put into use before the start of school in September, which will effectively alleviate the pressure on office and training." Qian Xuedeng, Engineering Department of the Infrastructure Department. This project standing on the north side of the hot spring campus is 193.3554 million yuan and a total construction area of 50899.5 square meters. It is the project with the largest total volume and total investment in the school in recent years. Now the surrounding trees are lined, the roads are refreshed, and the facilities such as ecological parking spaces are all available, which has become a new landmark building in the school.
In the summer of the summer, the grass and trees are lined with lively and lively.
The main gate of the hot spring campus of the hot spring campus and the family members of the staff of the staff of the staff and the family members of the faculty and staff are renewed. The newly -built five student dormitory projects are bidding. The total investment is estimated to be 140 million yuan of health and innovation and education center project entry plan design, project proposal and research preparation stage. .. Each of the project construction, construction, and proposed projects have brushed out the "new height" of the project construction to empower the school's high -quality development.
Project construction running out "acceleration"
"The student dormitory project has finally been hung on the Internet." The stones planned by the Infrastructure Division planned Ko Li finally landed. From the planning design to the construction bidding network, it only took eight months to run a new speed of project construction.
Grab the time is to grasp the construction. Open Li Li's work diary. On November 19, 2021, he applied for project planning and design. On March 25, 2022, he obtained an engineering planning permit. Hanging the net ... a thick stack of work diary clearly records the "speed and passion" of the inflike's grasping project construction.
Grasping time is efficiency. New projects are promoted. Project construction is a systematic project. Each link of establishing, planning, approval, and construction is intertwined. In which place, if you do not follow up, the entire construction period will be extended. The new student dormitory project is related to the development of the school. The pouring period of the infrastructure office is planned to complete the project construction with the shortest time.
Grasping time is to grasp the results. Maintenance and renovation and operation, any work is sloppy. One day, clean, dredging and transformed the mud, leaves and other debris in the drainage ditch of the administrative prestigious tract. After the maintenance and transformation, there was no obvious accumulation of water accumulation, which was well received by teachers and students; half a month was completed. The roof and wooden floors of the wind and rain stadium are replaced to effectively improve the sports teaching environment; the maintenance and transformation of the digital college was completed within 20 days, and the maintenance and transformation of the Humanities College was completed in three weeks.
The development of the school is not waiting for people. Everyone is motivated by the Infrastructure Division. It is not at the project construction site, or it is on the road of running the project.
Service guarantee "temperature with temperature"
"For 32 years, the stones that were pressed in my mind finally landed." On July 3, 2021, with the full promotion of the school's infrastructure department, Xianning Real Estate Registration Center opened a certificate. On the day of the 194th teachers of the hot spring, I got a real estate certificate. Subsequently, he came to the door to apply for a face -to -face signing for the family members of the faculty who were inconvenient, and successively applied for a total of 348 faculty residential real estate certificates, which solved the problem of passing the certificate that could not be resolved over the years.
"Seeing everyone getting a certificate for a moment, the smile on our faces, our infrastructure office even paid for the month of the month. As an old school employee, we can help teachers and students to apply for a real estate certificate. The Repair Division Baoqiang (head of the original real estate section) introduced that the old campus real estate office certificate involves multiple administrative departments in cities such as housing construction, taxation, and state assets. With thousands of times without running, I finally did it.
One branch and one leaf always close the affection, and the service guarantee has no size. One week completed the sinking and repair of the studio floor of the School of Education. The mud pits in the middle of the parking lot of the West District of the administrative building were turned into 4 parking spaces. The drainage sulcus sewage was found in the inspection campus 3 hours, and the library leakage was completed in three days Repair, complete the maintenance and renovation of the archives in one week ... Behind the service of the service to the teacher's heart is the "1234" working method implemented by the Infrastructure Division. According to the "Sanmin" activity arrangement, the office will further optimize the service process and improve service efficiency. At present, the OA approval process of infrastructure sporadic maintenance is currently being triald, and offline reporting is changed to online approval, and documents run into the system. This emotion demonstrates the transformation of the service concept of influx, and they transformed the development of the service school into services into the hearts of faculty and staff. "Infrastructure projects are related to the overall situation of the school's reform and development, and it is also related to the sense of happiness and gain of teachers and students." Bai Yuting, member of the Standing Committee of the Party Committee and Vice President of the school, said that we must continue to deepen and expand my practical activities for the masses. The "Sanmin 'activity, in accordance with the" teacher -student order, school dispatch, infrastructure receiving order "model, further serve everyone to serve teachers and students, turn the development blueprint of the school's party committee into a beautiful reality, and make teachers and students'" heart -minded things "change. The "care" of the Chengyin Office made the "care" of the Infrastructure Division a "warm -hearted thing" for faculty and employees. (Correspondent: Tian Li Li Li, Hubei University of Science and Technology)
- END -
Add 3 new majors!Come to this university in Xinjiang to experience the "ice and snow"
Tianshan News (Reporter Zhao Siya reported) The reporter learned from Altai Vocati...
More than 40 graduates accept adult gifts for the rule of law
Ji Mu Journalist Sun TingtingVideo editing Sun TingtingCorrespondent Yang Lan Zhou...