Approval!Putian Xiuyu No. 1 Primary School will build a new teaching building

Author:Straits Herald Putian News Time:2022.06.23

About the approval of the feasibility study report and preliminary design and budget for the feasibility study report of the Children's Teaching Building in Xiuyu District, Putian City

Putian City Xiuyu District Cucumber Primary School:

The report was reported to the "Research Report and Preliminary Design and Preliminary Design and Preliminary Instructions of the Children's Teaching Building in Xiuyu District, Putian City, and the" Requests for the Primary Design and Preliminary Design and Both Budget "(埭 埭 〔[2022] No. 1) and related materials. After research, the current approval is as follows:

I. Project name and construction necessity: Construction of Putian Xiuyu District Cucumber Primary School Children's Teaching Building (Project Code: 2205-350305-01-3122221) Construction, which meets the school needs of surrounding young children and improves the foundation of the school Hardware facilities are of great significance, and principles agree to project construction.

2. Project Construction Location: Cucumber Primary School, Xiuyu District, Putian City

3. Project Unit: Squet Cucumber Primary School, Xiuyu District, Putian City

4. The scale and main content of the project construction: The land area of ​​the project plan is about 5511.9m2, and a teaching building is planned to build. The total construction area is 810.41m2.

5. Main design standards:

(1) The main structure of the main structure is 50 years.

(2) The fire resistance level of the main building is second.

(3) Structural security level is first.

(4) The project sets up by seismic anti -seismic in the basic intensity of the earthquake.

6. Engineering budget and funding source: The total investment of the project budget is 44.826.2 million yuan. Construction funds are resolved from the subsidies of superiors and district finance.

7. Project construction period: 8 months.

8. Bidding content: shall be implemented in accordance with the bidding and bidding law and relevant regulations.

Nine, social stability risk assessment: The overall risk level of the project is low risk. Please strictly implement project risk prevention and resolution measures, and effectively safeguard the vital interests and social stability of the masses.

The project unit is requested to further improve the design plan; in accordance with the requirements of basic construction procedures and project legal person responsibility system, bidding and bidding system, engineering supervision system, contract management system, etc., strengthen management, implement environmental protection measures and safety production measures, ensure the quality and safety of the project, and schedule Complete the construction task.

Attachment: General Booking Table of Engineering

Development and Reform Bureau of Xiuyu District, Putian City

June 21, 2022

- END -

When the middle school entrance examination is on, the duck!Students around Aba Prefecture

— Fighting the middle school entrance examination -When the entrance examination ...

Haidian "Cloud" job fair "air capture talent"

A few days ago, the first Western regional specialty Cloud recruitment fairs were held in the two districts of Shijingshan and Mentougou. This job fair, relying on the Mentougou Human Social Secu