How does our "wartime" store the magical materials in the wild?Straach of the whole process

Author:CCTV military Time:2022.08.21

In our army war, the storage unit in the wild

How to build it?

How to the first time of ammunition materials

Delivery "front line"?

Together with the reporter of the main station

Wuxi Lianqin Security Center certain storage base

Through a supply guarantee model drill

Full process experience "Smart Lianqin"

Quickly build a wild storage unit

Remaining and unloading is super fast

At a storage base at the Wuxi Lianqin Security Center

A supply guarantee model drill unfolding

Simulate the rapid construction of the storage unit during wartime

Participating officers and soldiers need to be completed

Storage venue construction and material delivery

After receiving the task instruction

Officers and soldiers quickly completed the outbound of transfer of transportation materials

Clear and seal the box

Forklift handle handle is shipped directly out of the material of the whole box

Waiting for forklifts outside

It is a large container truck

The reason why no general truck is guaranteed

It is because of container truck

Not only does the uninstallation efficiency high

It can also be stored temporarily with a dealer library

At the same time of loading and unloading

All -terrain field forklift and engineering operating vehicle

The newly compiled new product delivery team

It has also completed the finishing and construction of the venue

After a few minutes

Vehicles carrying materials enter the venue

Start unload

In the storage operating area

Truc

A container is more than 6 meters long

But the entire uninstallation process only takes 2 minutes

Trip -based packaging, modular storage

The efficiency of ammunition transportation is greatly improved

Ammunition

It has also greatly improved protection efficiency

The ammunition at the scene was placed on the forklift tray

After tied up

You can put the ammunition in a fork car

Plus directly to the ground and store it

Before

Loading and unloading ammunition

One car ammunition requires six or seven people

It takes an hour to complete

Now

Uninstall the ammunition through the mechanization of the fork mechanization

Only two to three people do some assistance

You can complete the task in 20 minutes

Materials that are stored for modernized storage

"Trip -oriented packaging, modularization in storage, base -based stacking"

It saves human resources

Simplify the process

Shorten the operation time

With warehousing visual, sorting groups and other technologies

Mature

Not only does it improve the capacity of maneuvering protection

And can make full play

The advantages of multi -way transportation

Let the equipment and supplies reach the front line as soon as possible

Modern war

Just fight logistics

As the basic system of logistics

The role of military logistics is important

As the core of military logistics construction

The goal of the new era storage base is

Build large -scale, comprehensive, intensive,

Military logistics hub

For a new type of complex with a variety of elements

Better integration into the combat system

Form new quality joint service forces

Efficient, fast

Build all the logistics for fighting

- END -

Clarified!"Blocking Taiwan Island", the PLA invested these weapons

Hitzon missiles, long -range rocket launchers, fighter jets, bombers, aircraft car...

The first domestic ship!"Hong Kong and Airlines Boat 01" Rotation goes smoothly!

Recently, the first domestic 3,000 -ton interior of the river pure electric contai...