Regarding several "pain points" of electric vehicles charging, we found a few operators ...
Author:Olympic News Time:2022.08.10
According to Aoyi News: Electric vehicle charging survey (1): "It is not difficult to find a charging station, but the charging is expensive, and the price increases several rounds." The "pain point" includes the expensive charging charging pile, the charging parking space is seized by the fuel vehicle, the charging equipment generates "jump gun", the outdoor charging station is exposed and unsafe, the charging APP and small program data are inaccurate.
When a new energy electric vehicle gradually enters millions of households
How to solve the "care of the later" of electric vehicles charging
It became the top priority
Some netizens vomit
"Can't people buy a tram and have no land charging?"
"The charging fee is increasing, and the goods are more than three every day."
"Fear of more costs added to charging costs"
Native
Electric vehicle charging price
How does it constitute?
Open the APP or small programs of the major charging stations, and the owners can search for the nearby charging stations with one click. Each charging station has also been publicized. During different periods of time, the charging price = electricity price+service fee.
In the same charging station, the service fee is sometimes discounted at the same time price of the same period on different APPs. During the period of 15: 00-17: 00, Dada charging, Xiaolian charging, Dada charging (charging station of the Crown Science and Technology Park) on the fast power is 1.38 yuan/degree, and the service fee of the first two is 0.26 yuan/ Degree, and the service fee for fast electricity is reduced to 0.221 yuan/degree.
Different charging APPs sometimes provide preferential activity prices, and there are also marketing methods for users to purchase membership cards for preferential charging.
At the same time, the price of different charging stations is different at each degree of electricity. During the 11: 00-12: 00s period, Dada charging (Charging Station of the Crown Science and Technology Park) was 1.38 yuan/degree, and the electricity price of Jingu No. 1 charging station was 1.42 yuan/degree.
In addition, Austrian journalists also observed that the lower the electricity price, the higher the service fee. Taking the Jingu No. 1 charging station as an example, during the period of 00: 00-07: 59, the electricity price was 0.32 yuan/degree, but the service fee reached 0.48 yuan/degree. At this time, the service fee had reached 150%of the electricity price; at 11: 11: During the 00-12: 00 period, the electricity price is 1.42 yuan/degree, and the service fee is 0.18 yuan/degree.
In July 2018, the Guangdong Provincial Development and Reform Commission issued the "Notice on the Price Related to the Power Price of New Energy Vehicle in Our Provincial", which will be implemented since July 1, 2018. The "Notice" mentioned "Shenzhen's various types of electric vehicle charging facilities with independent electric meters installed, and perform a large amount of electricity or high demand for electricity in accordance with the report capacity. The following, or the charging facilities accessing facilities access by the public transformer shall be implemented in accordance with the electrical price standard corresponding to the electricity phase. "
In December 2021, the Shenzhen Municipal Development and Reform Commission issued the "Notice of the Shenzhen Municipal Development and Reform Commission on Further improving the issues related to the annual hourly electricity price policy of Peak Valley in our city", which will be implemented from February 1, 2022. The "Notice" mentioned that Shenzhen's large -scale, high demand industrial and ordinary industrial specialized users in the implementation of peak valleys will implement the spike electricity price policy in July, August and September. For three hours for 11: 00-12: 00, 15: 00-17: 00.
The peak electricity price floats 25%on the basis of the peak price of the peak valley. Specifically, a large number of industrial users of each voltage level are 250kWh and below (ie, one gear) per month per month, and high -demand industrial users will use the peak of 400kWh per kilowatt per month per month Based on the electricity price, the price of the second -speed power is as lower as the price price of the electricity price of 2 cents as the current peak Pinggu electricity price;
Shenzhen Peak Valley Time Electricity Price Comparison Relationship Table as follows:
According to the above documents, the charging pile equipment shall perform a large amount of electricity or high demand for electricity price standards according to the report capacity. Entering July, August, and September, the charging pile charging charging piles in Shenzhen is in the period of peak electricity price policy, and the price is up to other months. Ao Yiyi reporters learned that the charging pile electric price peak from each charging applet is also at the two periods of 11: 00-12: 00, 15: 00-17: 00.
On December 29, 2017, the Shenzhen Municipal Development and Reform Commission issued the "Notice on Improving the Policies of Motor Vehicle Parking Service in Our City". The "Notice" shows that from now on, parking spaces for new energy vehicles will be parked on urban roads. During the prescribed charging period, you will enjoy temporary parking space use fees for 2 hours a day, or the first parking time for the first day of parking ( For 1 hour), the second parking fee is free of one -hour temporary parking space use fee.
Electric vehicle charging prices are different
How does charging pile construction and operating company pricing?
For the price pricing situation of electric vehicles, the customer service personnel of special call new energy Co., Ltd. (hereinafter referred to as special calls),
Special electricity charging price consists of two parts, partly connecting electricity prices. According to government guidance prices, specific regional power supply prices, one is the service fee, which is determined by the operating cost and specific situation of the venue.
The staff of Shenzhen Otxun Electric Power Equipment Co., Ltd. (hereinafter referred to as Ottox) introduced: "The charging service fee is priced at each region different, and the local government guidance of the upper limit price and the price of the surrounding charging stations affect the pricing of our company. , The company will formulate relevant charging standards according to the actual situation of various regions. "For the expensive charging of electric vehicles, the staff of Otxun said that the charging costs of Otxun's charging stations in Shenzhen are mostly flat or lower than the surrounding stations. At present, no user feedback on electricity bills is too high, and Otxun will be adjusted and improved according to the opinions of customer opinions and actual conditions.
In terms of management and maintenance of charging stations
What are the measures for operating companies?
Earlier, Austrian journalists visited a number of social charging stations and learned that many charging stations have charging parking spaces to be occupied by fuel vehicles and charging equipment. In this regard, what measures does major charging stations operate in major charging stations? Intersection
It is understood that since 2015, Otxun has gradually established and improved the management system of charging stations, and has formulated a comprehensive operating management system and safety management system. At present, each charging station is equipped with stations management personnel, which is responsible for solving problems encountered in the customer charging process in real time. The equipment maintenance currently adopts the inspection system, once a weekly inspection, and the failure of the failure is reported in time and the maintenance is performed.
There is also a comprehensive management system for charging stations. It has set up protective measures such as site logo and fire protection facilities. When the owner can also use the APP code to scan the code or dial the customer service telephone feedback and consult.
Special Corporation of Electricity Website Automobile Group Charging Solutions (One)
In addition, what are the emergency plans for the outdoor charging stations reflected by the car owner?
Ao Yiyi reporters learned that Otxi established a special emergency rescue team for the security stations. According to the requirements of government departments and the field conditions of various stations, it was , Equipment damage and other accidents) and other natural weather conditions have formulated special emergency plans. In addition, emergencies such as fire, battery explosion, power supply system failure, and personnel contacts have also been formulated. Exercise work for related plans.
Some operators said
It will develop towards high -power supercharge direction
Meet the new needs of car owners charging
Shenzhen New Energy Vehicle has continued to increase. How does the charging piles of various operating companies in Shenzhen arrange? What are the development of the future?
According to the special power customer service staff, at present, there are 426 online operating charging stations in Shenzhen, with 12,839 online operation equipment; 587 construction charging stations and 1,8091 construction. All districts in Shenzhen are distributed, and the specific situation is not public.
The staff of Otxun also introduced to Aoyi News reporter that Outun's new energy section will continue to improve the network of intensive flexible public charging stations based on the overall planning and layout of the city to meet the increasingly increasing growth of new energy vehicles need. In addition, with the gradually moved towards the market with 240kW, 480kW, and larger charging power electric vehicles, Outun will develop in the direction of high -power supercharge (600KW) in the future, reduce the charging time of car owners, and meet the owner of "charging like refueling". need.
Produced: Ao Yishi Test Research Institute
Writing: Ao Yi's reporter Yu Yue Li Yuan
Design: Liang Xueer
- END -
2022 The 14th Xi'an Auto Show opened today
On June 22, this year's first large-scale automotive exhibition in our city-the 14...
Just now, the results are released!Hangzhou netizens have taken screenshots: 86 times, and finally wait for you!
just,40,000 special indicators in Hangzhou have been shaken out at one time!Are yo...