Qingyuan Hydrological Branch launched a flood investigation work
Author:Qingyuan Radio and Television Time:2022.08.12
Since June, affected by "Dragon Boat Water" and "Typhoon and Rain", Qingyuan City has fallen into heavy rain to heavy rain, and heavy rainstorms in local areas. flood.
After the flood, in order to further investigate the flood situation, the Qingyuan Hydrological Branch held a work conference on the flood investigation and deployment, and re -deployed, emphasized, and mobilized the flood investigation. The meeting emphasized that this flood investigation work covers a wide range of coverage, long duration, and heavy work tasks. All the technical staff of the branch bureau must fully understand the importance of this work. Based on the flood investigation work carried out in the early stage The relevant technical requirements of the Survey Specification (SL196-2015), comprehensively sort out the tasks of the flood investigation, refine the division of tasks, continue to carry forward the spirit of continuous operations, unity and cooperation, and ensure that the flood survey work is completed on time and quality.
After the meeting, the Qingyuan Hydrological Branch quickly implemented the work deployment of the conference, organized multiple flood investigation teams, and rushed to each flood survey site to carry out work at a high temperature of 38 degrees Celsius. , Measure the high -end of the flood marks, conduct record records of flood marks, collect Da flood information, etc. At the same time, to learn more about the flooding situation from nearby villagers, observe the water conservancy facilities along the river, and organize the survey data in a timely manner to conduct systematic collation and analysis to further further further further Do a good job of hydrological testing, improve hydrological monitoring facilities, improve the level of water conditions early warning, and improve the capacity of rising rain and flood defense work.
A few days ago, this round of flood investigation has been fully opened. According to the weather forecast, due to the influence of water vapor of the typhoon, the Qingyuan area will still be mainly high temperature and rainy weather in the future. Torrential rain, move forward bravely, do a good job of investigating various flood investigations, timely compile the flood survey report, continuously consolidate the foundation of the hydrological test report, and provide more powerful hydrological technical services for Qingyuan flood prevention and disaster reduction work.
Editor -in -chief: Qingyuan Radio and Television Railway Media Operation Center
- END -
Within 3 years, Wuhan will build 40 high -value patent cultivation centers, focusing on breaking key core technologies of basic fields
The Yangtze River Daily Da Wuhan Client July 29 (Reporter Liu Ruiche Correspondent Gui Jun) In 3 years, Wuhan will build 40 high -value patent cultivation centers. It was learned on the 29th that the
Creepy, dying stars, look like the door to the underworld
NASA released the image of the dying star CW Leonis shot by HubbleAs Halloween arr...