Yuanwang No. 5 ship successfully completed the "Ask Sky Experimental Curring" to launch maritime measurement and control missions

Author:Study legion Time:2022.07.24

Yuanwang No. 5 ship successfully completed the "Ask Sky Experimental Curring" to launch maritime measurement and control missions

At 14:22 on July 24th, Beijing time, my country used the Long March 5 to carry the rocket in the Wenchang launch site in Hainan, and successfully launched the test compartment to launch. Waiting for the Chinese satellite maritime measurement and control department in the scheduled waters to take the exam, the far -fifth ship of Yuanwang 5, and successfully captured the target and stable tracking in time after receiving the Luhai test control baton. Should be contributed.

Since performing the Tianhe Core Class mission last year, this mission is the second time the Shiyuan No. 5 executes the space station mission. As the main force in my country's maritime measurement and control network, since joining the Yuanwang family, the far -widen -looking ship No. 5 has sailed more than 580,000 nautical miles, and successfully completed more than 80 maritime measurement and control tasks represented by Shenzhou, Chang'e, and Beidou. The success rate reached 100 %.

According to Wang Xiaoming, deputy captain of Yuanwang No. 5, Wang Xiaoming: "In this task, the situation of the low -elevation tracking state in the tracking arc is long, and the system capture the tracking process is greatly affected by the sea waves. The ship fully carried out the trace of transit target drills under the condition of complex sea conditions. During the exercise, the subjects were added to the low -elevation arrest, the range of miscellaneous waves exceeded the maximum blind spots, etc., which greatly improved the operation level of the operation of the operation and the analysis and judgment ability. The experimental cabin launching and controlling tasks laid a solid foundation. "

In recent years, with the increase of the space launch tasks, in order to ensure the disappointment of maritime measurement and control tasks, far away from Shiyuan 5 has continuously strengthened the ability of scientific and technological personnel to perform the task, especially during the relying on Hong Kong rest. In advance to simulate the task process, familiarize the task plan, organize internal joint adjustment drills, and further check the status of the equipment and refine the staff.

"During the mission, all the participants in the ship No. 5 have always been aware of the quality of the tree, strictly organized the task document review, technical exchange dialogue, comprehensive task software test, emergency plan drill, system joint testing and other work. , Predicted, associated, checking problems, checking hidden dangers, and "three thoughts and three investigations" activities to ensure that there are no problems with hidden dangers to participate in measurement and control tasks. "Wang Xiaoming, deputy captain of Yuanwang 5, said so.

It is understood that the Yuanwang No. 5 of the Experimental Curdine Mission will move forward at full speed and continue to go to the next target sea area to perform other measurement and control tasks.

Author 丨 作 作 作 Wang Lingshuo Wang Lingshuo

Photography 丨 Wang Luyao Ni Hui Zhao Fulin

Source 丨 Learning Legion (ID: xuexijuntuan)

- END -

Steady economy promotes development | Yingtong Dairy "milk bottle" is stable

There are submitting tasks every quarter, and at the end of each quarter, Submitti...

Listing, Haidian is the ninth this year!

On July 7th, Haidian Enterprise Zhongye Technology was listed on the GEM of the Sh...