East China Power Grid Real Equipment Disposal Application Application Application Application Population Application

Author:State Portal Newspaper Time:2022.09.21

At 14:55 on September 14th, the dispatcher of East China Electric Power Dispatching Control Center in the "Jiangsu Fenghui 5032 Switching Second Switching Failure Protecting Power Plates" electronic application sheet with mouse clicks "permitted networkization". So far, East China, East China Power grid realizes the network -oriented application of equipment suspension.

According to reports, the applicant application for the suspension of the network processing equipment is bidirectional, which can be initiated by the dispatcher, or it can be initiated by the on -site staff. Compared with the traditional scheduling telephone handling, the application for the application of the network -based equipment suspension of the equipment has greatly shortened the time of the application of the device suspension application form, extension, and refund to the application. For example, the use of networked treatment can save 1.5 hours. Networking processing can also prevent the scheduling staff from being disturbed by telephone. The dispatcher can check the system information after completing the work at hand; use text information instead of the voice information of the phone, the information interaction is clearer and clear, and the application of the device suspension of the device suspension of the device suspension of the resumption of the device suspension of the resumptions Single -handed security.

The East China Branch of the State Grid Co., Ltd. adheres to the actual work of the work, and conducts the functional design of the integrated system of maintenance without changing the direction of the application for the application of the device to suspend the retirement application. On the basis of full seminars, system development, expert conferences, comprehensive joint adjustment, and promotion training, the branch department launched a network -oriented equipment suspension application application form in the four provinces and one cities of East China Province, one city, and one city. The first stage of trial operation improves the scheduling production operation efficiency during the autumn maintenance period.

In the next stage, the China State Grid China East Branch will continue to schedule production and operation business networking, digitalization, and intelligent transformation exploration and practice, further improve the efficiency of scheduling production operation, and ensure the safe and stable operation of the power grid.

- END -

Emergency announcement!Temporary closed library!

Hebei Museum Closing Museum AnnouncementDear audience:On August 25, 2022, the relevant departments were notified to close the library due to the emergency due to the epidemic.Sorry for the inconvenien

The first anniversary of the establishment of the Beijing Stock Exchange: The total market value of 110 listed companies is about 200 billion yuan

Reporter Meng KeOn September 2nd, the Beijing Stock Exchange (hereinafter referred to as the Beijing Stock Exchange) ushered in the first anniversary of the announcement. The Establishment of the B