To revitalize more than 2,000 acres of construction land, Ezhou's first township and township global land comprehensive renovation renovation face
Author:Pole news Time:2022.09.04
Polar news reporter Li Xiancai
Correspondent Ding Xinyi
On September 4th, in the valley surrounded by peaks, the eyes were green mountains and green mountains, and the ears were watery birds. On the rural road of Tingzu Town, it seemed to be in a paradise.
Mine becomes a good field
"Now the changes here are really big! In the past, the abandoned mines were desolate, and now they have become Liangtian and vitality." Mr. Liu, a villager Liu Yun Village, Tingzu Town, said with emotional emotion of Zhide's abandoned mine. These changes are also pleased by the builders of the five bureaus of the China Construction Fifth Bureau participating in rural construction.
The comprehensive land comprehensive rectification project of Tingzu Town, Ezhou City, which was built by Wuhan Branch of the 5th Bureau of China Construction Fifth Bureau is one of the first batch of native land pilot projects in Hubei Province. It is a strategy of serving ecological civilization and rural revitalization. It is a country and the people. The livelihood project. The total area of the project is 7618.32 hectares, involving 19 administrative villages in Tingzu Town. Through the implementation of the three major categories of agricultural land comprehensive remediation, comprehensive rectification of construction land, comprehensive remediation of construction land, ecological protection and restoration, and environmental improvement, it restructured the community of life of the "landscape, forest, forest, lake grass". In the tide of helping the revitalization of the countryside, the project is promoted to the entire element of the project, and the "face value" of the countryside is fully refreshed.
"Industrial Scar" becomes good field beauty
Establish more than 2,000 acres of construction land
As early as the 1950s, the mine opened in Tingzu Town, Echeng District. What is worrying is that due to long -term mining, the local ecological environment is severely damaged, leaving only bare mountains. When it encounters heavy rain, there are often dangerous situations such as mudslides on the mountains.
Ecological restoration
Planting green and reclaiming, repaying "ecological bonds", the beautiful rural construction of Tingzu Town cannot open this way. Since the start of the project in October 2021, it has made every effort to promote the abandoned land of reclaiming industrial and mining. Through the overall remediation of the land, we have strived to revitalize the resources of rural construction land, and strive to build Tingzu Town into a demonstration base for "green mines".
Huang Qiang, the person in charge of the project of the Fifth Bureau of the Construction Party, said that during the rectification, in accordance with the idea of "one mine, one strategy, pilot first", Liu Yuncun Zhide Mining Area, Dingyu Village Guishan Copper -iron Mining Area, Wuyi Village Da Da Da Hongshan Iron Mining Area is a demonstration point for the project mining of the project to build high -standard farmland and zero to complete. In addition, through the construction methods such as the residual mine, the flat excavation recipe, the slag stones, the backfilling of the slag, and the return of the home soil back, the area of the abandoned mine in more than 10 plots is about 39 hectares, and the new cultivated land area is 31 hectares. , Build vegetables, fruits and greenhouses and picking gardens. "After the project is implemented, it is expected that the construction of about 2,300 acres of construction land can be concentrated to promote the optimization of land space, and it has left enough space to promote the industrial upgrading and transformation of the town."
Build a "barrier" ecological "barrier"
Beautiful villages press "Beauty Key"
Nowadays, several villages entering Tingzu Town are stacked in the mountains, the streams are winding, and the cooked smoke ... It is difficult for ordinary people to associate the scenery in front of them with the "mining town" well -known in the past.
"Green water and green mountains are the golden mountains and silver mountains, and the improvement of the ecological environment is the development of productive forces." Huang Qiang, the person in charge of the project, said that the project improvement adheres to the ecological priority and green development, and coordinate the comprehensive management and system governance of landscapes, forests, lakes and grass.
With the gradual development of mines, soil repair, ground disaster governance, and mining reclamation sub -projects, the abandoned mines can be repaired and green. At that time, the mine that was "crowded and full of holes" had been put on a "green clothes", showing the charming style of green mountains, surrounding green water, and harmonious coexistence of human and nature.
The project aims to build a beautiful and livable countryside. On the basis of keeping the original appearance and retaining nostalgia, the project has improved the quality of the village of Tingzu Town through infrastructure such as road improvement, node construction, and toilet revolution; Essence The project has completed a total of 170 village bays in 19 villages and a total of 170 garbage and harmless treatment facilities, and 1,200 household toilet reconstruction projects to enhance the road 20 kilometers and create more than 10 landscape nodes.
The appearance of Tingzu Township has changed dramatically. The village and outside the village have a clean and beautiful environment. "Da Garden", these visible and touching happiness make the villagers beauty in their hearts.
Candid tourist resources
"Four Good Rural Road" becomes a local happiness road
Ezhou's "Lake Hanghu Lake Pillow" is known as the "Hundred Lakes City". In order to enrich the excavation of tourism resources, the Scenic Area such as Baiyu Mountain, Dongfang Mountain, and Sifeng Mountain is connected to facilitate villagers and tourists to travel. This is the main line of Tingzu Town connecting Huangshi City. Due to the long years of disrepair, it is muddy in rainy days, and it is easy to slip on the snowy days. It is inconvenient to enter and exit villagers. There are hidden safety hazards.
Road reconstruction
At present, the reconstruction of the Tinghuang Line Road has been paved 4.04 kilometers of water stabilization. The asphalt surface layer paving is ongoing. On June 28, the project completed the upgrade and renovation of the bear road section of the Sifengshan Tourism Highway and the concrete surface layer. Believe. Sub -items such as the "Four Good Highways", water environment improvement, and tourism infrastructure in the countryside are also being promoted.
After the completion of the above projects, the natural landscape and human resources of Tingzu Town will be connected to the line, creating a 4A -level tourist ring line with unique poetry and painting, and the establishment of the "National Urban and Rural Integration Development Demonstration Zone" in Ezhou, promoting agricultural and cultural tourismThe integration of high -quality development has laid a solid foundation for the new model of ecologically livable rural beauty, industrial prosperity, and rich development in order to transform the black economy in the past mining black economy to the ecological green economy.(The picture is provided by the correspondent)
- END -
The cosmetics propaganda activities of Lengshuijiang Market Supervision Bureau are wonderful
2022-07-01 08:42 Loudi News Network Chen Huizhong Zhang Jianhua(During this year's...
From artificial land to mechanical Xiantian Agricultural professional managers, the changes in Sichuan agriculture in the eyes of a professional manager of Sichuan | Mine years
Cover Journalist Yang BoDriving large agricultural machinery, operating drone, Xia...