For more than 10 years "Broken", Wuhan Mi Grain Road is about to open to traffic

Author:Pole news Time:2022.08.26

Polar news reporter Li Xiancai

Correspondent Wu Jian Panxun

On August 24th, more than 10 years after the road "Broken", Mi Gan Road, Hanyang District, Wuhan City was about to usher in traffic, making the surrounding residents happy.

Since the launch of the practice activities of party members and cadres "to observe the people's affection for the people and help the people", the Wuhan City Urban Construction Bureau has adhered to the people -centered concept of the people, and implemented the working method of "co -construction, co -construction, co -evaluation, sharing". Go deep into the central urban areas such as Hanyang District, continue to pay attention to solving the problem of the people's urgency and anxiety, establish a long -term work mechanism of "crossing the broken block", open up the "broken road", carry out road value improvement work, create a comfortable and smooth "Huihui Hui Hui "People's transportation" "improves the construction of urban road networks, making urban roads smoother, convenient and pleasant.

The last 308 -meter road has traffic conditions

On the 24th, Jimu Journalists noticed at the site of the Miliang Road (Qintai Avenue -Golden Road) project that the main structure of the project had been completed, and the construction party was preparing for road pre -acceptance.

The road of Miliang Road (Qintai Avenue -Golden Ring Road) is the urban branch, with a total length of 992 meters. It is located in the Golden mouth area of ​​Hanyang District, from Qintai Avenue in the north, and the Golden Ring Road in the south.

Among them, the Golden Road to the Golden Ring Road (newly built section) is two -way 2 lanes. The project was opened to traffic in August last year, which is convenient for the safe travel of teachers and students of contemporary Wanguo City Kindergarten along the route, avoiding vehicles of contemporary Wan Guo City Community and Wantong Industrial Park. Line, the traffic pressure in the golden mouth area to achieve the road network cycle of the golden mouth area; the Golden Road to the Golden One Road section is the upgrading section of the old road. It has been opened, and the road is smooth; only the Qintai Avenue to the Golden Two section is not open.

Mi Fa Road (Qintai Avenue-Golden Road) Section

"Part of the" Broken "of Mi Grain Road has been in the past for more than 10 years, and it is going to open to traffic now, it is good." Many surrounding residents were looking forward to it. In the 308 -meter -long rice grain road (Qintai Avenue -Golden Road) section, Jimu Journalists saw that the brand -new two -way 4 -lane road has been black, and the marking line on the road is scratched. Water -transmitting tiles are covered with lanes and sidewalks, and camphor trees are planted.

The project leader of the construction party Wuhan Zhiyuan Municipal Construction Engineering Co., Ltd. said that the project has the conditions for opening traffic and is preparing for road preparation and acceptance. After the post -acceptance procedures are completed, road traffic will be opened as soon as possible.

Multi -party cracking "is expected to be unreachable" dilemma

It is understood that the roads and drainage projects of Mi Grain Road (Qintai Avenue -Golden Ring Road) are difficult. The demolition work involves 2 industrial buildings (Wantong Industrial Park, Weixiang Food Co., Ltd.), and 2 private households. Among them, there are two electric rod wires in the road red line occupying the road lane. The cable involves the factory and nearby residents' electricity, which is very difficult to relocate.

After the project road collection and demolition work was launched, the difficulty of acquisition was: First, it was difficult to communicate and coordinate with residents, and the workload of ideological work and aftercare treatment measures; second, the demolition and concessions involved in the factory of the factory were difficult.

In the promotion, the Hanyang District Construction Bureau actively coordinated the traffic management and the urban management department to speed up the approval of the project operation procedures; many times organized the Yongfeng Street, the Urban Management Bureau, and the Hanyang Economic Development Zone to hold a project promotion meeting By the decisive role.

With various efforts, in September 2021, the roads from Qintai Avenue to the Golden Two sections were constructed; in December of the same year, car sidewalks and some sidewalks were completed on the spot. In the first half of 2022, the implementation sections of this road were completed. Due to the influence of the power rod line, the remaining 80 meters, half of the lanes and sidewalks could not be constructed, and were in a state of stopping.

Since the implementation of the practical activities of the "lower foundation to observe the people's feelings to relieve the people's heart and warm the people's hearts", the Wuhan City Urban Construction Bureau and the Hanyang District Construction Bureau have repeatedly dispatched power relocation work. The relocation and reform of overhead power rods along the line to crack the construction dilemma. At present, the main body of the road has been connected throughout the board.

The Construction Bureau of Hanyang District: showing the feelings of the people in the hard work

Since the beginning of this year, the Hanyang District Construction Bureau has called on party members and cadres to go deep into the grass -roots level, give full play to the advantages of resources, serve the grassroots, serve the masses, and show the people's feelings in the practice. Essence

The road of the people is the road to the people, and happiness can reach the "ground". Tao Jialing Road is upgraded, focusing on refined construction, improving road service functions, solving safety problems caused by mixed motor vehicles, non -motor vehicles and pedestrians. In terms of microcirculation roads, Longyang Lake East Road has done a good job of supporting roads for Taojialing Primary School. It is expected that the main project of the Kangda Street-Taojialing Primary School section is completed before the start of the school in September, and the construction content of the Taojialing Primary School-Zhujiaxin port section is completed during the year.

Zhiyin Avenue (Fairy Mountain Road-Yangcheng West Road) section

The road is fully upgraded to enhance the city's face value. The interval zone in the middle of Hanyang Avenue is building a low -line park in Mign. It not only serves the surrounding residents, but also enhances the value of the road and provides a leisure walk venue.

Coordinate the slow system and build a benefit of the people.The Hanyang District Construction Bureau took the lead in the construction of a slow -moving system, reasonably guided the setting of the slow -moving system, and created a comfortable and smooth "benefit people's transportation".In 2022, the district plans to carry out a special transformation of non -motorized lanes for 10 kilometers to complete the preliminary study of road slow transportation system solutions, and orderly promoting the construction of slow -moving system transformation and construction of roads such as Qintai Avenue and Hanyang Avenue.Pay attention to the design of the zero high difference, no obstacle design, so that travel has "no hindrance".The relevant person in charge of the Hanyang District Construction Bureau said that the District Construction Bureau has adopted a variety of channels such as field visits, mass visit, and self -examination to collect the demands of the masses, and effectively understand the wishes of the masses and the concerns of the market entities., Task list, effect list, integrate multi -party resources, improve the construction of urban road networks, and continuously meet the needs of the people's good travel needs.

(The picture is provided by the correspondent)

- END -

Over 700 billion yuan of major projects appeared in Shanghai to press recovery and regain the economic "acceleration keys"

Xinhua News Agency, Shanghai, June 16th. Question: Over 700 billion yuan of major ...

Foreign media: Tokyo, Japan in July, the price of the price of nearly 7 and a half years in the past 7 and a half years

Zhongxin Jingwei, July 29. According to the report from Japan's common website, the consumer price index of consumer prices in the 23rd district of Tokyo, which was announced on the 29th of the Minist...